Arrangement of a rope park in the "Poznyaki" park in Darnytskyi district
Arrangement of a rope park in the "Poznyaki" park in Darnytskyi districtArrangement of a rope park in the "Poznyaki" park in Darnytskyi districtArrangement of a rope park in the "Poznyaki" park in Darnytskyi district
17.04.2019-16.05.2019
№ 1013

Arrangement of a rope park in the "Poznyaki" park in Darnytskyi district

Project data:

Status - The competition to attract investors completed. Defined winner.

Kyiv City State Administration informs that according to the results of the investment competition for attracting the investor to implement the project "Arrangement the rope park in the area of the park "Poznyaki" in Darnytskyi district", the limited liability company "AKTYVNA DARNYTSYA" is defined as the winner, the results approved by the order of the Kyiv city state administration from June 27, 2019, No. 1171.

Legal framework

Order of the KCSA from August 16, 2018, No 1489

Project owner

KP UZN of the Darnytsky district of Kyiv

Preparatory (pre-investment) works

ME "Kyiv Investment Agency"

Description of the project

ME "Kyiv Investment Agency" has developed and agreed on the indicative technical and economic indicators and possible pre-design proposals for the project. The project provides for the construction of a rope park in the "Poznyaki" park in Darnytskyi district. The construction of the rope park does not require the removal of greenery and is one of the types of ecological or "green" recreation of the citizens.

Address

The territory of the "Pozniaky" park, Darnytsky district, Kyiv.

Location

The plot of land on which the rope park is planned to be located is situated on the territory of the "Poznyaki" park near the Mykhayla Drahomanova street and Petra Hryhorenka avenue in Darnytskyi district of Kyiv. There is a public transport stop and Pozniaky Metro Station nearby.

Technical and economic indicators*

Indicator Unit Total
1. Approximate area of the territory of the arrangement ha 0.1
2. Routes of the rope park m 400
3. Floor coverings m2 215
4. Fence m 300
5. Four Temporary structures, including:

The area on the outer contour

m2 117.6

GBA

m2 102.1

GLA, including:

m2 97.3

5.1.

Temporary structure №1
5.1.1. Cashier m2 7.0
5.1.2. Staffroom m2 14.6
5.1.3. Corridor m2 2.7

5.2.

Temporary structure №2
5.2.1.

Inventory

 m2 21.6
5.2.2. Corridor  m2 2.7

5.3.

Temporary structure №3
5.3.1.  Coach room  m2 25.1

5.4.

Temporary structure №4
5.4.1. WC men  m2 4.4
5.4.2. WC women  m2 7.7
5.4.3. WC  for people with limited mobility  m2 4.9
5.4.4. Corridor m2 6.6
6. The height of four Temporary structures m 3.5
7. Number of floors floor 1
8. Estimated project budget UAH 2,188,442.95


* All the above indicators are indicative and provided for familiarization