Arrangement of a park with sports infrastructure on the 36 Mikhail Hrushevsky street in the Pechersky district
Arrangement of a park with sports infrastructure on the 36 Mikhail Hrushevsky street in the Pechersky districtArrangement of a park with sports infrastructure on the 36 Mikhail Hrushevsky street in the Pechersky districtArrangement of a park with sports infrastructure on the 36 Mikhail Hrushevsky street in the Pechersky district
Arrangement of a park with sports infrastructure on the 36 Mikhail Hrushevsky street in the Pechersky district
21.07.2018-20.08.2018

Arrangement of a park with sports infrastructure on the 36 Mikhail Hrushevsky street in the Pechersky district

Project data:

PROJECT DESCRIPTION

There are a playgrounds, tennis courts and football field with a tribune on the site (which can not accommodate viewers due to the abandoned condition, as a result of which spectators can be placed only on temporary stands for 200 seats). Pre-project proposals include the construction of an existing stadium with a football field, existing stands, tennis courts, playgrounds. It also provides for the arrangement of a park for rest, a playground, a climbing wall, a complex of structures for skateboarding.

ADDRESS

36 Mikhail Hrushevsky street, Pechersky district, Kyiv, Ukraine.

LOCATION

Within walking distance from public transport stop (100 m) and 250 meters from the Arsenalna metro station.

TECHNICAL AND ECONOMIC INDICATORS*

Approximate land area: 3.64 hectares

Tribunes: 2,530 m

The football field with artificial cover (113 x 72 m): 8,136 sq.m.

Tennis court with artificial cover (36 x 18 m) - 2 pcs: 1,296 sq.m.

Covering artificial (running track 6 pcs 1,2 m): 3,150 sq.m.

Lawn covering: 7,994 sq.m.

Surface of natural stone: 4,500 sq.m.

Sand cover (artificial): 3,150 sq.m.

Project budget: 64 681 384,00 UAH

STATUS

The investment competition is completed.

The following decisions were taken at the meeting of the permanent competitive commission on attraction of investors:

- The working group was instructed to draw up a protocol for the disclosure of the tender offer of the participant of the competition to attract the investor to the project implementation.

- The working group was instructed to conduct a detailed study of the submitted investment proposal and put it together with their findings for consideration on the next meeting of the commission to approve the results of the competition.