Active entertainment and recreation zone with the improvement of the territory in Holosiyivsʹkyy Park
Active entertainment and recreation zone with the improvement of the territory in Holosiyivsʹkyy ParkActive entertainment and recreation zone with the improvement of the territory in Holosiyivsʹkyy Park
14.12.2019-13.01.2020

Active entertainment and recreation zone with the improvement of the territory in Holosiyivsʹkyy Park

Project data:

StatusThe investment tender is over.
The winner of the investment tender determined.
An investment agreement has been concluded with the investor.
Legal backgroundResolution of the KCSA from 07.11.2019 № 1924
Project ownerKP UZN of Holosiyivsʹkyy district of the city of Kyiv
Preparatory (pre-investment) worksMunicipal enterprise "Kyiv Investment Agency"
InvestorLLC "SBONDS-UKRAINA"
The object of investmentArrangement of an active entertainment and recreation zone with the improvement of the territory in Holosiyivsʹkyy Park
Project descriptionThe project envisages the construction of a children's amusement park and recreation facilities.
Estimated Total Cost of InstallationUAH 2,819,245.63 

The estimated technical and economic parameters*


IndicatorUnitTotal
Indicative Arrangement areaha0.75
Three temporary structures, including:
Temporary structure Am224.3
- Cashierm27
- Staff onlym214.6
- Corridorm22.7
Temporary structure Bm224.7
- Inventorym224.7
Temporary structure C
m225.1
- Coaching roomm225.1
The area along the outer contour of three temporary structures, including:m288.2
Total aream276.1
Usable aream274.1
The height of the temporary structurem3.5
Number of floorsfloor1
Аrborspcs.25
Type 1 - 2.5x3 mpcs.20
Type 1 arbor aream27.5
Type 2 - 2.5x6 mpcs.5
Type 2 arbor aream215
Indicators of the recreation areas:
Tube Slide 1m50
Tube Slide 2m70
Catamaranspcs.16

Estimated technical and economic indicators of improvement work in the park

IndicatorUnitTotal
Trash binspcs.5
Benchespcs.5

All investment projects