+38 (044) 2021319
Mon - Fri: 9.00 - 18.00
logo

Kyiv
Investment
Agency

Downloads Аа- Аа+
Reconstruction of the building on the 15-A Ihor Shamo boulevard in the Dniprovskyi district under clinical and laboratory center
Reconstruction of the building on the 15-A Ihor Shamo boulevard in the Dniprovskyi district under clinical and laboratory centerReconstruction of the building on the 15-A Ihor Shamo boulevard in the Dniprovskyi district under clinical and laboratory centerReconstruction of the building on the 15-A Ihor Shamo boulevard in the Dniprovskyi district under clinical and laboratory center
Reconstruction of the building on the 15-A Ihor Shamo boulevard in the Dniprovskyi district under clinical and laboratory centerReconstruction of the building on the 15-A Ihor Shamo boulevard in the Dniprovskyi district under clinical and laboratory center
04.08.2016-30.09.2017
№ 580

Reconstruction of the building on the 15-A Ihor Shamo boulevard in the Dniprovskyi district under clinical and laboratory center

Project data:

PROJECT DESCRIPTION

The project includes reconstruction of two existing floors of nonresidential building (746 m2) and superstructure of two floors on a land plot with total area of 0.1466 ha. Functional purpose of the building - modern clinical and laboratory facility.

LOCATION

An investee located in the Dniprovskyi district of Kyiv and bordered by high-rise residential buildings and educational institutions. The proximity of public transport - 350 m.

Technical and economic indicators

Name Indicator befor reconstruction Indicator after reconstruction
Approximate land area, ha 0.1466 0.1466
Build-up area, m2 332.8 395.0
GLA, m2 690.8 1 430.3
GBA, m2 746.0 1 580.0
Number of floors 2 4
Floor area of clinical and laboratory center, m2 498.4 931.9
General premises space (hall, corridors, stairs), m2 192.4 498.4

Landscaping surrounding area, m2

221.0
Decorative paving tiles coverage area, m2 415.0
Asphalt area, m2 435.0

PROJECT STAGE

The investment object is included in the list of objects that require investment attraction (Order of Kyiv City State Administration No. 639 dated August 4, 2016)

Approval of pre-design 

NEXT STEPS

Preparation of the terms and conditions of investment tender

All investment projects