+38 (044) 2021319
Mon - Fri: 9.00 - 18.00
logo

Kyiv
Investment
Agency

Downloads Аа- Аа+
Construction of a ski resort with objects for active all-season recreation "Pirogovo" in Goloseevsky district
Construction of a ski resort with objects for active all-season recreation "Pirogovo" in Goloseevsky districtConstruction of a ski resort with objects for active all-season recreation "Pirogovo" in Goloseevsky district
27.03.2018-27.03.2018

Construction of a ski resort with objects for active all-season recreation "Pirogovo" in Goloseevsky district

Project data:

Estimated technical and economic indicators *

1. An artificial reservoir (33,000 m2)

2. Ski slopes of varying complexity and slope (5 tracks 15-40 m wide), total area 73200 m2 (without a rental zone, in the summer - tubing):

3. Ski lifts (2 lifts 4-6 - chairlifts, 250 m and 500 m long)

4. Haf-pipe (length 100 m, slope 7 deg., Width 13 m, depth of 6.5 m)

5. Year-round Rodeldan with manual control (rail, length 2 km)

6. Hotel and restaurant complex (total area 5400 m2) + parking

7. Hotel hotel (55 houses of 3 types, total area 4905 m2)

8. Equestrian sport club ( building area 8400 m2, indoor and open arenas, stable, cafe, mini-hotel, tech. room, parking)

9. Cafe (150 seats, 800 m2)

10. Sports complex (9595 m2)

11. Public center (6315 m2, 2 floors, foodcourses, restaurant, skeleton, children's playgrounds premises, equipment rental, parking)

12. Sports grounds (tennis - 3 fields, mini football - 4 fields, tennis table 5 tables, street simulators, - 12 000 m2)

13. Cafe-restaurant area of the show (1100 m2)

14. Buildings of the outback zone (trading, rolling, stands, etc. - 370 m2)

15. Rope Park (3000 m2, including temporary buildings, 88 m2)

16. Shirmbar area of the show (150 m2, Orient.170 seats)

17. Cafe 1 st extraction (1500 m 2) + parking

18. Landscape Park (optional, 94 500 m2)

All investment projects