Arrangement of sports grounds on the territory of the park, located on the Dnieper embankment near the Berkovschina Bay in Darnytskyi district of Kyiv
Arrangement of sports grounds on the territory of the park, located on the Dnieper embankment near the Berkovschina Bay in Darnytskyi district of KyivArrangement of sports grounds on the territory of the park, located on the Dnieper embankment near the Berkovschina Bay in Darnytskyi district of KyivArrangement of sports grounds on the territory of the park, located on the Dnieper embankment near the Berkovschina Bay in Darnytskyi district of Kyiv
14.04.2020-14.05.2020

Arrangement of sports grounds on the territory of the park, located on the Dnieper embankment near the Berkovschina Bay in Darnytskyi district of Kyiv

Project data:

StatusThe investment tender was finished.
The winner of the investment tender has been determined (Order of the Kyiv City State Administration).
An investment agreement has been concluded.
Legal backgroundOrder of the KCSA of February 24, 2020, № 312
Project ownerKP UZN of Darnytskiy district of Kyiv
Preparatory (pre-investment) worksMunicipal enterprise "Kyiv Investment Agency"
The object of investmentArrangement of sports grounds on the territory of the park, located on the Dnieper embankment near the Bay of Berkovschina in the Darnytskyi district of Kyiv.
The approximate total cost of constructionUAH 4.47 million

Indicative technical and economic indicators

IndicatorTotal
Approximate area of the Arrangement0.25 ha
Sports grounds (fields for mini-soccer 42х22 m)
Supports for lighting12 
Projector lights12 
Fence400 m
Four interlocked temporary structures, including: 
Temporary structure №124.7 m2
Temporary structure №224.8 m2
Temporary structure №325.7 m2
Temporary structure №424.8 m2
The usable area of the premises in temporary structures100.0 m2
GBA of  temporary structures104.8 m2
The area along the outer contour of the temporary structures120.0 m2
Height of temporary structures3.5 m
The number of floors1


Final technical and economic indicators and detailed information on the Investment Object, incl. the final (total) cost of the arrangement of the Investment Object will be determined on the basis of the developed and approved in the prescribed manner project documentation or other documentation provided by the legislation of Ukraine.