Arrangement of an active family recreation park in the Sovky Park in the Sviatoshynskyi district
Arrangement of an active family recreation park in the Sovky Park in the Sviatoshynskyi districtArrangement of an active family recreation park in the Sovky Park in the Sviatoshynskyi districtArrangement of an active family recreation park in the Sovky Park in the Sviatoshynskyi district
13.07.2021-12.08.2021

Arrangement of an active family recreation park in the Sovky Park in the Sviatoshynskyi district

Project data:

Status
  • The project is included in the list of objects that need to attract investment;
  • Indicative technical and economic indicators and possible pre-project proposals have been developed;
  • Investment tender completed;
  • Bids were opened;
  • The winner of the investment tender (Order of the Kyiv City State Administration) has been approved;
  • An investment agreement has been concluded.
Legal basis order of the Kyiv City State Administration dated 02.11.2020 № 1738
Customer of the project implementation KP UZN of Sviatoshynskyi district of Kyiv.
Customer of preparatory (pre-investment) works Municipal Enterprise "Kyiv Investment Agency".
Object of investment Arrangement of an active family recreation park in the Sovky Park in the Sviatoshynskyi district
Location The territory of arrangement of the Investment Object with an approximate area of 1.8 hectares is located on the territory of Sovky Park in Sviatoshynskyi District
Estimated project budget UAH 2.96 million.
Additional Information The construction of capital structures on the territory of the Investment Object is prohibited. Arrangement of the Investment Object (its components) is carried out by installing only prefabricated temporary structures without the installation of foundations. The arrangement of the Investment Object is carried out without causing damage to the natural objects located on the Territory of the arrangement.


Indicative technical and economic indicators

Indicator Unit Total
Arrangement Area ha 1.8
Temporary structures (4 types), including:    
Connected temporary structure №1: pcs. 1
The area of the temporary structure 1 along the outer contour m2 30.0
The area of the temporary structure 2 along the outer contour m2 30.0
The area of the temporary structure 3 along the outer contour m2 30.0
The area along the outer contour of the 3 connected temporary structures m2 90
Connected temporary structure №2: pcs. 1
The area of the temporary structure 1 along the outer contour m2 30.0
The area of the temporary structure 2 along the outer contour m2 30.0
The area of the temporary structure 3 along the outer contour m2 30.0
The area along the outer contour of the 3 connected temporary structures m2 90.0
Connected temporary structure №3: pcs. 1
The area of the temporary structure 1 along the outer contour m2 30.0
The area of the temporary structure 2 along the outer contour m2 30.0
The area along the outer contour of the 2 connected temporary structures m2 60.0
Temporary structure №4 (gazebo): pcs. 20
The area along the outer contour of the temporary structure m2 16
Volleyball field pcs. 1
Cinema site pcs. 1
Petanque pcs. 2
Table tennis pcs. 8
open-air gym pcs. 1
Children's play complex pcs. 1


Final technical and economic indicators of the Investment Object, direct placement of objects within the territory as well as detailed information about the Investment Object, including the final (total) cost of the Investment Object will be determined on the basis of the project documentation or other documentation provided by the legislation of Ukraine developed and approved in accordance with the established procedure.